[Case Study] Lift-Up Method
A construction method that raises the building without demolishing it. The building remains as it is while the roof height is increased.
We would like to introduce a case where Denki Kogyo Co., Ltd. adopted the "Lift-Up Method." Due to the aging of the existing traveling crane, we received a request for an increase in crane lifting height. In the construction process, we connected the column for the raised portion to the existing column head in a way that enhances strength, and then, using the cover build method, we installed a new roof and walls before dismantling the existing roof from the inside. As a result of this construction, the crane lifting height was increased, allowing for more flexible crane movement, which improved work efficiency. [Case Study] ■ Challenge: Increase in crane lifting height ■ Result: The crane lifting height was increased, allowing for more flexible crane movement, which improved work efficiency. *For more details, please refer to the PDF document or feel free to contact us.
- Company:ヨシザワ建築構造設計
- Price:Other